(Summary description)According to "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment of the People's Republic of China" According to the Law, the construction unit entrusted Zhejiang Environmental Technology Co., Ltd. to undertake the environmental impact assessment of the "Shangyu Nutrichem Fine Chemical Co., Ltd. pesticide technical product transformation and upgrading and by-product refined phenol comprehensive recycling project". In accordance with the relevant requirements of the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" and the "Decision of the People's Government of Zhejiang Province on Amending the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" (Order No. 364 of the People's Government of Zhejiang Province), the Shangyu Nutrichem Fine Chemicals Co., Ltd. has conducted public participation in the environmental impact assessment of the transformation and upgrading of pesticide technical products and the comprehensive recycling and utilization of by-product refined phenol, so that the public in the areas that may be affected by the project construction may have an understanding of the project construction situation, and through Information disclosure is to understand the public's attitudes and suggestions on this project, and accept the supervision of the public.

Shangyu Nutrichem Fine Chemical Co., Ltd. Pesticide technical product transformation and upgrading and environmental impact assessment of by-product refined phenol comprehensive recycling project public participation information disclosure

(Summary description)According to "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment of the People's Republic of China" According to the Law, the construction unit entrusted Zhejiang Environmental Technology Co., Ltd. to undertake the environmental impact assessment of the "Shangyu Nutrichem Fine Chemical Co., Ltd. pesticide technical product transformation and upgrading and by-product refined phenol comprehensive recycling project". In accordance with the relevant requirements of the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" and the "Decision of the People's Government of Zhejiang Province on Amending the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" (Order No. 364 of the People's Government of Zhejiang Province), the Shangyu Nutrichem Fine Chemicals Co., Ltd. has conducted public participation in the environmental impact assessment of the transformation and upgrading of pesticide technical products and the comprehensive recycling and utilization of by-product refined phenol, so that the public in the areas that may be affected by the project construction may have an understanding of the project construction situation, and through Information disclosure is to understand the public's attitudes and suggestions on this project, and accept the supervision of the public.

Information

According to "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment of the People's Republic of China" According to the Law, the construction unit entrusted Zhejiang Environmental Technology Co., Ltd. to undertake the environmental impact assessment of the "Shangyu Nutrichem Fine Chemical Co., Ltd. pesticide technical product transformation and upgrading and by-product refined phenol comprehensive recycling project". In accordance with the relevant requirements of the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" and the "Decision of the People's Government of Zhejiang Province on Amending the "Administrative Measures for Environmental Protection of Construction Projects in Zhejiang Province" (Order No. 364 of the People's Government of Zhejiang Province), the Shangyu Nutrichem Fine Chemicals Co., Ltd. has conducted public participation in the environmental impact assessment of the transformation and upgrading of pesticide technical products and the comprehensive recycling and utilization of by-product refined phenol, so that the public in the areas that may be affected by the project construction may have an understanding of the project construction situation, and through Information disclosure is to understand the public's attitudes and suggestions on this project, and accept the supervision of the public.

1. Basic situation of construction projects

Project name: Transformation and upgrading of pesticide technical products and by-product refined phenol Comprehensive Recycling Program

Construction location: 9 Weijiu Road, Shangyu Economic and Technological Development Zone, Hangzhou Bay No. (Existing South Plant)

Project nature: Reconstruction and expansion

Total planned investment: 1013.0628 million yuan

Construction content and scale: This project implements optimization and reconstruction of the South Plant. The existing second workshop, third workshop, sixth workshop and the west workshop of fifth workshop will be demolished and reconstructed; the analysis building will be built using the open space after the demolition of the auxiliary house of the original sewage station; Use the open space of the Class C warehouse and the Class E storage yard to build a new high-bay warehouse; use the Class A warehouse 1, the Class A warehouse 2, the tank In the open space after the demolition of group 1, build tank group 1, tank group 3, tank group 4 and pump area; renovate the existing tank group 2 and pump area, use the open space after the bathroom and toilet dismantled to build a new substation; use the spare space Build a new intelligent manufacturing master control center, auxiliary housing for sewage station, non-motor vehicle shed, and equipment storage yard on the land; expand the existing one workshop; rebuild the existing sewage station, RTO and other public facilities.

Purchase reactors, centrifuges, DCS automatic control systems and other equipment, and transform and use the original equipment, Formed an annual output of 4000t azoxystrobin (expanded 3400t/a), an annual output of 3000t tebuconazole (2400t/a expansion), and an annual output of 4100t fomesafen series products (among which fomesafen 3000t/a, Acifluorfen sodium salt 300t/a, 42% acifluorfen sodium salt parent drug 500t/a, lactofenfurfop 300t/a, total expansion 3800t/a), annual output of 3000t oxyfluorfen ( Expansion of 1800t/a), annual output of 300 tons of sulfentrazone, annual output of 4000 tons of mesotrione (expanded production of 3400t/a), annual output of 1000 tons of propinoxachlor (expansion of 900t/a), annual output 500 tons of isoxaflutole (300t/a expansion), with an annual output of 200 tons of dichlorooxazinone (NC-43) (consistent with the existing production capacity). Co-production of methyl acetate 5225t/a, acetic acid 5490t/a, potassium chloride 12670t/a, potassium sulfate 2585t/a, calcium phosphate 1315t/a, sodium sulfite 1700t/a, refined phenol 100t/a.

 

 

2. Distribution of main environmentally sensitive targets within the scope of the environmental impact assessment

According to the on-site investigation, the surrounding areas of the factory are mainly enterprises, farmers, rivers, roads and open spaces. A large area of ​​natural vegetation communities and rare animal and plant resources. Environmental protection targets are mainly sensitive points near the project. The basic information is shown in Table 1.

(1) Air: The protection target is the air quality target of the environmental sensitive area around the construction area.

(2) Water environment: The target of surface water protection is the environmental quality target of river water in the park; the target of groundwater protection It is the environmental quality target of groundwater water bodies around the plant.

(3) Acoustic environment: The protection target is the acoustic environment quality of sensitive points within 200 meters around the factory boundary Target.

Table 1 List of environmental sensitive points around the proposed project site p>

Environmental elements

Area

Administrative Village

Coordinates

Protect objects

Protect content

Ambient Ribbon 

relative

Orientation

Relative field boundary distance (m) 

X

Y

ambient air

Gaibei Town 

Industrial Park Living Area

3337147.1

296305.7

-

"Acoustic Environment Quality Standard" (GB3096-2008) Category 2 Standard

"Ambient Air Quality Standard" (GB3095-2012) Secondary Standard

Class 2 sound environment functional area/Class 2 ambient air quality function District

Northeast

1600

Shihai Village

3334888.07

294228.61

About 2,500 villagers

South

1055

Xinghai Village 

3335432.57

294757.93

About 6,700 villagers

South

705

United Village

3336266.48

296359.69

About 7,800 villagers

East

1620

Xinhe Village

3335527.54

296817.54

About 5,790 villagers

Southeast

2150

Zhuhai Village

3336398.93

297110.24

About 2795 villagers

East

2386

Xia Gai Mountain Village 

3333976.84

295627.95

About 1023 villagers

South

2212

Songxia Town

Qianzhuang Village

3333525.3

291792.5

About 3,100 villagers

Southwest

2970

Liantang Village

3333316.5

291695.1

About 1,600 villagers

Southwest

3160

Surface water

Center River

-

-

-

"Surface Water Environmental Quality Standard" (GB3838-

2002) Class III Standard

Class III water quality multi-functional area

North

17

Acoustic Environment

No environmentally sensitive points within 200m around the site

-

Class 3 sound environment ribbon

-

-

3. Prediction of major environmental impacts

Under normal working conditions, the hourly concentration, daily average concentration and annual average concentration of exhaust gas discharged from this project can all be Comply with the corresponding environmental quality standards and will not have a great impact on the regional ambient air quality;

The production wastewater, domestic sewage and initial rainwater of this project have been pretreated by the sewage treatment station in the plant area to meet the management standard After that, it will be included in Shangyu Sewage Treatment Plant for centralized treatment, and only the rainwater will be discharged to the outside after cleaning, so this project has little impact on the water quality of nearby water bodies. At the same time, after taking necessary anti-seepage measures for this project, the impact on the surrounding groundwater environment is within an acceptable range.

All kinds of solid waste generated by this project can be disposed of harmlessly, and the impact on the environment is not obvious ;

All noise sources in this project can meet the factory boundary standard after taking sound insulation and noise reduction measures, and no adversely affect the surrounding environment;

According to accident prediction and evaluation results, the project is in the process of ensuring equipment quality and personnel management and operation level , the accident risk level is acceptable.

 

4. Main environmental protection measures to be taken, environmental risk prevention measures and expected effects

The main environmental protection measures, environmental risk prevention measures and expected effects to be taken by the project are shown in Table 2.

Table 2   Main environmental protection measures, environmental risk prevention measures and expected effects

Noise

Production workshop

Choose selected equipment, local sound insulation, empty for high-noise equipment Add mufflers and other facilities to the press, and strengthen equipment maintenance.

Meet the "Environmental Noise Emission Standard for Industrial Enterprises" (GB12348 - 2008) in the standard limit of Class 3 area, which will not affect the surrounding sensitive points.

Risk Prevention

① Formulate an environmental risk emergency plan, and it is recommended to entrust a professional unit to prepare it; ② Improve emergency facilities according to the emergency plan; ③ Carry out emergency drills and strengthen daily management.

Meet the requirements of risk prevention measures span>

5. Preliminary conclusion of environmental impact report evaluation

Shangyu Nutrichem Fine Chemical Co., Ltd. transformation and upgrading of pesticide technical products and comprehensive recycling of by-product refined phenol The project is proposed to be built at No. 9 Weijiu Road, Shangyu Economic and Technological Development Zone, Hangzhou Bay (existing South Factory Zone), which conforms to the environmental function zoning of Shangyu District, national and local industrial policies, and conforms to the overall urban planning of Shaoxing, the overall planning of Shangyu, Hangzhou Bay Shangyu Economic and Technological Development Zone planning and planning environmental assessment requirements, the production technology and equipment technology adopted are in line with the requirements of clean production. After the implementation of various pollution prevention and control measures, all pollutants can be discharged up to the standard; after the total amount of pollutants in the project is resolved through regional balance, it conforms to the principle of total amount control. After the pollutants are discharged up to the standard, the contribution to the surrounding environment is not large, and the impact on the environmental protection target is small, and the local environmental quality can still meet the requirements of the functional area. From the perspective of environmental protection, this project is feasible to implement in the existing plant area.

6. The way and time limit for the public to view the abbreviated environmental impact report

The public can check the environmental impact report at the construction unit from now on, and the check time will be from April 2019 From 09 to April 22, 2019 (ten working days). For further information, you can consult the construction unit and the EIA unit. The time limit is from April 9, 2019 to April 22, 2019 (ten working days).

7. Scope and main issues for soliciting public comments

The public participation in the EIA of this project will solicit representatives of citizens, legal persons or other organizations within the scope of the project evaluation. For the opinions and suggestions on this project, the main contents of soliciting public opinions include the main environmental issues of public concern, the possible impact of the project construction on the surrounding environment, and other opinions or suggestions on the environmental protection work of the project.

8. Specific forms of soliciting public opinions

The evaluation unit, the local environmental protection administrative department and the examination and approval department shall express their opinions or suggestions. When giving feedback or suggestions, please be sure to leave your real name and contact information.

IX. Start and end time for public comments

The time for public comments is from April 9, 2019 to April 22, 2019 (Ten working days).

10. Contact information

1, construction unit name and contact information

Construction unit: Shangyu Nutrichem Fine Chemical Co., Ltd.

Contact: Mr. Feng                   Tel: 15356858287

Mailing address: No. 9, Weijiu Road, Shangyu Economic and Technological Development Zone, Hangzhou Bay 

2, EIA name and contact information

Environmental Impact Assessment Unit: Zhejiang Environmental Technology Co., Ltd. 

Address: Building 3, No. 199, Xiangxiang Street, Future Science and Technology City, Yuhang District, Hangzhou    ;                

Contact: Jiang Gong                    Tel: 0571-87331042          

Email: 375463914@qq.com   

3, the contact information of the EIA approval unit

Unit Name: Zhejiang Provincial Department of Ecology & Environment        ;      Tel: 0571-28869159

Address: No. 117 Xueyuan Road, Hangzhou City, Zhejiang Province

4, local environmental authorities and contact information 

Local Environmental Protection Department 1: Shaoxing Ecological Environment Bureau Shangyu Branch      ; Tel: 0575-82119933

Address: No. 26, Stadium Road, Shangyu District

Local Environmental Protection Department 2: Environmental Protection Branch of Hangzhou Bay Shangyu Economic and Technological Development Zone

Tel: 0575-82735203

XI. Method and time of publication of environmental impact report

The EIA report of this project will be published on our parent company website (www.nutrichem. cn) to make the full version (excluding confidential content) public.

Shangyu Nutrichem Fine Chemical Co., Ltd.

              April 09, 2019

Classification

Engineering measures

Description of countermeasures p>

Expected effect

Wastewater

Wastewater collection system

Classified collection of process and production wastewater: ① All sewage pipes are overhead (2) The sewage and rainwater are separated in the whole plant, and emergency facilities for waste water accidents are set up;

Finally treated by Shangyu Sewage Treatment Plant to achieve the "Comprehensive Sewage Discharge" Standard" (GB8978-1996) in the first-class standard, of which COD≤80mg/L

Wastewater treatment 

The wastewater is treated by the sewage station in the plant area, and the effluent reaches the "Comprehensive Sewage Discharge" Standard" (GB8978-1996) three-level standard limit after the pipe into the Shangyu sewage treatment plant for treatment. An online monitoring system is set up at the main waste water discharge outlet to strengthen the supervision and management of the discharge of project waste water up to the standard.

Exhaust

Process waste gasPreprocessing

The company plans to eliminate a set of design air volume of 16000 m3/h RTO, a new set of RTO with a design air volume of 28,000 m3/h has been added. After the technical transformation project is implemented, the total air volume of RTO is 40000m3/h.

Organic waste gas mainly relies on RTO incineration in the factory area. According to the nature of the waste gas, the waste gas without dichloroethane is processed by the RTO device after pretreatment, and the waste gas containing dichloroethane is processed by the paraffin oil spray device or resin adsorption device after pretreatment.

Process waste gas emissions must meet the "Comprehensive Emission Standards for Air Pollutants" (GB16297-1996) secondary standard in Table 2 and emission requirements of "Technical Guidelines for Environmental Impact Assessment Pesticide Construction Project" (HJ582-2010)

Solid waste

Industrial solid waste 

Hazardous waste is entrusted to qualified enterprises to handle. The solid waste is collected by classification, and a special site is set up to prevent wind, sun, rain, and strict anti-seepage. The temporary storage facilities for hazardous waste meet the requirements of GB18597-2001 and its amendment (Ministry of Environmental Protection Announcement No. 36 of 2013). .

All types of solid waste can be safely disposed of

Household waste

Collection, comprehensive utilization or sanitary landfill.

Scan the QR code to read on your phone

Recommended News

LINKS:

Nutrichem

Hotline

E-mail:INFO@nutrichem.cn

Address:No. 27, Life Science Park Road,  Changping Dist., Beijing. 102206 P. R. China

Nutrichem

Copyright © 2022  北京颖泰嘉和生物科技股份有限公司